Business application · Project scheduling

Primavera P6 training and adoption.

Guide your planners, site managers and project controllers directly inside Primavera P6, at the moment of the action, without modifying the application.

24/7built-in support
-50 %support requests
30-50 %faster adoption
Primavera P6
kSTEP 2 / 3Enter the actual start date.
kSTEP 1 / 3Open the task on site.kSTEP 3 / 3Update the remaining work here.
K-NOW
Step-by-step guidance
Report progress from site
K-STUDIO
Train yourself
Reset a date on the critical path
Clear a hand-over reservation
Primavera P6 adoption
Complete support to make adoption easier.
Primavera P6 training and adoption

Turn a dense project portfolio into simple actions, from the task to the gate.

Primavera P6 structures detailed schedules, resources, costs and progress on large projects. Its functional depth is its value, and it is also what makes some journeys hard to remember when you only use them at each milestone.

 Our solutions

Primavera P6 adoption for your users.

Deliver help, training and announcements directly inside Primavera P6, without touching the application.

01

Support the site, not the planning office

The planner masters the critical path. The site manager reporting progress from the field wants to enter it quickly and get back to work. Two opposite uses of the same schedule.

02

Make progress reported from site reliable

Progress estimated roughly, an actual date entered the following week or a task marked complete without sign-off all shift the whole critical path. These are the steps to secure on the screen itself.

03

Take the load off your key users

After go-live, key users absorb the day-to-day questions at the expense of their own work. Help displayed on the screen takes over the most repetitive questions.

 Measurable results

From first steps to autonomy.

24/7
support built into Primavera P6
-50 %
support requests
30-50 %
faster adoption
 Typical user journey

Continuous support inside Primavera P6.

Step 1

Preparing for go-live

Each profile replays its own actions — create a task, enter effort, pass a gate — on a replica of Primavera P6, without touching real data.

Step 2

Contextual help

At the slightest doubt inside the application, the steps to follow appear on the screen where the action happens, with the points of attention specific to your business rules.

Step 3

Measurement & improvement

Real usage is measured screen by screen: which sites drop off, which step blocks, which content should be revised first.

 About Primavera P6

A detailed project schedule, from the critical path to site tracking.

Published by Oracle, Primavera P6 covers detailed scheduling, resources, costs and progress tracking for large engineering and construction projects.

The solution integrates with the ERP and site tools, which multiplies the touchpoints and the profiles involved.

Modules covered
Detailed schedule and critical path
Resources and assignments
Costs and progress curves
Milestones and contracts
Site tracking and reporting

Expertise deployed at scale.

Knowmore in figures
40 %
of CAC 40 companies
70
countries
+7 M
users
+400
applications supported
Integrations

Get the most out of your software.

All applications
Frequently asked questions

Primavera P6 adoption: your questions.

How do you succeed in a Primavera P6 go-live?
Moving to Primavera P6 changes the daily actions of very different profiles: project leadership, contributors, finance control, procurement. The method is to have them practise before the switchover on a simulated replica with K-STUDIO, to certify them before go-live, then to keep the guidance K-NOW running through hypercare— the set-up Knowmore deploys on the project applications it supports.
How do you make progress reporting from site reliable?
A schedule is only worth how fresh its data is: actual start date, percentage complete, remaining work, reservations. Guidance puts those rules on the update screen, so the weekly report takes a few minutes.
How do you support teams spread across several sites and languages?
Help content is tailored by entity, by job role and by language, then delivered inside the application without touching Primavera P6.
How do you measure PPM adoption?
K-VALUE measures usage screen by screen: which sites really apply the process, which fields stay empty, which workflow steps are bypassed. Improvements are then prioritised on observed rather than reported usage.
Your scheduling project

Accelerate Primavera P6 adoption at every stage of the user journey.

See how Knowmore reduces training needs, makes technical data reliable and lightens the load on your key users.

Talk to our expert