White paper · 2026 edition · PLM

PLM white paper: successful PLM implementation and user adoption

A free 15-page guide, 2026 edition, to help designers, manufacturing engineering, purchasing and quality truly use the same PLM, from the design office to industrialization: method, PLM training by function, use cases and customer stories.

  • The four barriers to anticipate when scoping a PLM project
  • Five PLM use cases, from revising a part to multi-site harmonization
  • Workflow usage indicators and a roadmap before, during and after go-live
Free download

Download the PLM white paper

Fill in the form and we will send you the white paper by email.

Cover of the Knowmore 2026 PLM white paper: driving adoption of your PLM
Driving adoption of your PLMPDF · 15 pages · with Max Fouache, PLM expert
✓ Free✓ Sent by email✓ 2026 edition
15pages of method and field experience
5detailed PLM use cases
3customer stories
7adoption indicators to track

In short: the white paper “Driving adoption of your PLM” (Knowmore, written with Max Fouache, PLM expert consultant, 2026 edition) is a free 15-page guide. It explains why the success of PLM software depends on every function using the workflows, well beyond the design office, and sets out a five-stage adoption method (map, prepare, guide, measure, sustain), five use cases (create and revise a part, update a BOM, approve a change, multi-site harmonization, new hires), three customer stories (Safran Seats, Safran Electronique & Défense, Cristal Optimisations), seven adoption indicators and a roadmap before, during and after go-live.

Who is it for?R&D and industrial managementPLM managersManufacturing engineeringQuality and purchasingIT departmentsChange & training teamsIntegrators
What is at stake

PLM project: an installed PLM is not a shared PLM

PLM software structures the entire life of the product: parts, revisions, BOMs, change requests, configuration management. Training often targets CAD experts, yet every function ends up using it. Its success depends on how each person applies the workflows, from design to industrialization.

The blind spot

Rare tasks, the first risk in a PLM project

Manufacturing engineering, purchasing and quality only open the PLM occasionally. A BOM changed outside the workflow or a revision that is not incremented is enough to break the digital thread. Help has to be available at the moment of the task.

Initial trainingUsers learn the PLM modules before they have a real change to process.
A few weeks laterThe real case never looks like the example, and the screen is only opened occasionally.
The step that blocksNobody is around when the change request has to be submitted.
Inside this white paper

PLM white paper contents: 8 chapters for a successful PLM project

  1. Why an installed PLM is not a shared PLM
  2. The four barriers to anticipate“The design office’s tool”, data and harmonization, training designed for experts, adoption over time.
  3. The method: map, prepare, guide, measure, sustain
  4. Five PLM use cases, from design to industrializationCreate and revise a part, update a BOM, approve a change, multi-site harmonization, new hires.
  5. Customer storiesSafran Seats (Windchill), Safran Electronique & Défense (3DEXPERIENCE), Cristal Optimisations (retail PLM).
  6. Managing adoption: the indicators that matter
  7. Your roadmap before, during and after go-live
  8. Knowmore and the expert at a glance
With Max Fouache, PLM expert

A PLM white paper written with an expert PLM consultant

“Choosing and configuring the right PLM software is not enough: the value of the project depends on how each function brings product data to life, from the first revision through to industrialization.”

The common thread of this white paper
About the expert

Max Fouache, independent PLM expert consultant

With 25 years’ experience in Product Lifecycle Management, Max Fouache has built expertise spanning IT, defense and aerospace in particular.

FAQ

Frequently asked questions about PLM software implementation

Who is this PLM white paper for?

R&D, engineering and industrial management, PLM managers, manufacturing engineering, quality and purchasing teams, IT departments, change and training teams, and integrators who deploy or upgrade PLM software.

Why does user adoption matter in a PLM project?

Because a PLM is only as good as its product data. If a function changes a BOM outside the workflow or approves a change by email, the digital thread breaks and downstream teams work with incomplete information.

How do you train users on PLM software?

By preparing functions rather than software experts: each profile rehearses its own tasks on a replica of the PLM with K-STUDIO, then K-NOW guides it directly inside the application for rare tasks, such as a change request or an approval.

How do you measure PLM adoption?

By actual workflow usage more than by the number of active licenses: share of changes processed through the PLM, approval times, abandoned steps, workarounds via email or parallel files. The white paper details seven indicators to track by site and by function.

Does the method work with every PLM system?

Yes. It does not depend on the vendor: Knowmore supports Windchill, 3DEXPERIENCE, Teamcenter and Centric PLM, as well as in-house product applications, among others.

Is the PLM white paper free?

Yes. Fill in the form and the PDF white paper will be sent to you by email.

Free download

Download the white paper and drive adoption of your PLM

Method, use cases, indicators and roadmap: everything you need for your PLM to be truly shared by all your functions.